Planning

Plan an interior painting project

Turn a room you want to refresh into a clear list of surfaces, choices and practical arrangements.

Where should I start?

LMJ planning suggestion

Walk through the space and list what you want to change: walls, ceilings, trim, doors, closets or cabinets. Mark what should stay as it is. Note stains, peeling areas and previous repairs, and take overview photos to explain your priorities. This helps your painter discuss preparation and prevents a wall-only request from being mistaken for a complete room repaint.

Why we recommend this
Industry reference

Painting Contractors Association · PCA P14 — Levels of Surface Preparation for Repainting and Maintenance Projects Receiving Architectural Coatings

What this explains: PCA P14 distinguishes four preparation levels and explains that existing surface condition and the selected preparation affect appearance, adhesion, durability and cost. Project specifications describing the type and extent of preparation take precedence.

Keep in mind: Applies to repainting/maintenance architectural coatings on previously finished surfaces. A written scope should identify the agreed preparation; citing P14 alone does not specify a level or promise restoration of every defect. No LMJ adoption or compliance is verified.

Read the original source ↗ (English · opens in a new tab)

Source content reviewed: November 7, 2026

Document and review details
Relevant section
P14 sections 1, 2.1–2.5, 5.2 and 5.4.
Applies to
U.S. architectural painting industry guidance; project agreement controls as applicable.. Repainting/maintenance preparation, rather than a universal new-construction specification.
Original document revision
Not stated in the reviewed document · Printed identifier: 20230918 in the official linked filename
Review method
Source content reviewed with assistance from Codex

Niveles de Preparación de Superficies para Proyectos de Repintado y Mantenimiento que Reciben Revestimientos Arquitectónicos ↗ (Spanish · opens in a new tab)

Official Spanish individual P14 linked from PCA Spanish page; scope and section 5.2 read. Layout and section organization differ; exact edition parity is not established.

Industry reference

Painting Contractors Association · PCA P3 — Impact of Paint Color

What this explains: PCA P3 says the number and location of paint colors and color ranges belong in bid and contract documents. It also calls for precise placement when different materials or sheens share a surface. These choices affect estimating and project cost.

Keep in mind: Industry guidance does not demonstrate LMJ membership, certification, adoption or compliance. It supports documenting the actual agreed scope, not promising that every estimate already follows PCA. It does not endorse an aesthetic palette.

Read the original source ↗ (English · opens in a new tab)

Source content reviewed: November 7, 2026

Document and review details
Relevant section
P3 sections 2.1–2.2, 5.1–5.2 and 5.6.2.
Applies to
U.S. architectural painting industry guidance; use as the identified voluntary standard in a project agreement as applicable.. Paint color count, range, placement and associated bid/contract scope.
Original document revision
Not stated in the reviewed document · Printed identifier: 20230918 in the official linked filename
Review method
Source content reviewed with assistance from Codex

PCA P3 — Designación del color de pintura ↗ (Spanish · opens in a new tab)

Official Spanish individual standard linked from the PCA Spanish page; sections 1, 2 and color-placement provisions read. Title, organization and wording differ from the English file, so do not claim exact edition parity.

What should I decide before buying supplies?

LMJ planning suggestion

Decide which surfaces are included and who will supply the paint and materials. Then confirm the product, color, sheen and preparation before shopping. Ask whether coverings, brushes, rollers and cleanup materials are included in the quote. If you already have paint, share its label and available quantity for review; owning a can does not establish that it suits the planned surface.

Why we recommend this
Industry reference

Painting Contractors Association · PCA P14 — Levels of Surface Preparation for Repainting and Maintenance Projects Receiving Architectural Coatings

What this explains: PCA P14 distinguishes four preparation levels and explains that existing surface condition and the selected preparation affect appearance, adhesion, durability and cost. Project specifications describing the type and extent of preparation take precedence.

Keep in mind: Applies to repainting/maintenance architectural coatings on previously finished surfaces. A written scope should identify the agreed preparation; citing P14 alone does not specify a level or promise restoration of every defect. No LMJ adoption or compliance is verified.

Read the original source ↗ (English · opens in a new tab)

Source content reviewed: November 7, 2026

Document and review details
Relevant section
P14 sections 1, 2.1–2.5, 5.2 and 5.4.
Applies to
U.S. architectural painting industry guidance; project agreement controls as applicable.. Repainting/maintenance preparation, rather than a universal new-construction specification.
Original document revision
Not stated in the reviewed document · Printed identifier: 20230918 in the official linked filename
Review method
Source content reviewed with assistance from Codex

Niveles de Preparación de Superficies para Proyectos de Repintado y Mantenimiento que Reciben Revestimientos Arquitectónicos ↗ (Spanish · opens in a new tab)

Official Spanish individual P14 linked from PCA Spanish page; scope and section 5.2 read. Layout and section organization differ; exact edition parity is not established.

Industry reference

Painting Contractors Association · PCA P3 — Impact of Paint Color

What this explains: PCA P3 says the number and location of paint colors and color ranges belong in bid and contract documents. It also calls for precise placement when different materials or sheens share a surface. These choices affect estimating and project cost.

Keep in mind: Industry guidance does not demonstrate LMJ membership, certification, adoption or compliance. It supports documenting the actual agreed scope, not promising that every estimate already follows PCA. It does not endorse an aesthetic palette.

Read the original source ↗ (English · opens in a new tab)

Source content reviewed: November 7, 2026

Document and review details
Relevant section
P3 sections 2.1–2.2, 5.1–5.2 and 5.6.2.
Applies to
U.S. architectural painting industry guidance; use as the identified voluntary standard in a project agreement as applicable.. Paint color count, range, placement and associated bid/contract scope.
Original document revision
Not stated in the reviewed document · Printed identifier: 20230918 in the official linked filename
Review method
Source content reviewed with assistance from Codex

PCA P3 — Designación del color de pintura ↗ (Spanish · opens in a new tab)

Official Spanish individual standard linked from the PCA Spanish page; sections 1, 2 and color-placement provisions read. Title, organization and wording differ from the English file, so do not claim exact edition parity.

Manufacturer guidance

Sherwin-Williams · Selecting Brushes & Rollers

What this explains: Brush and roller materials depend on the coating. Roller nap depth is selected with the surface texture in mind; smoother and rougher surfaces have different guidance.

Keep in mind: Not a product-specific application specification, safety assessment or proof of LMJ workmanship. No brush-performance marketing figures are adopted here.

Read the original source ↗ (English · opens in a new tab)

Source content reviewed: November 7, 2026

Document and review details
Relevant section
Bristle Type; Roller Cover Material; Pile Depth.
Applies to
U.S. general brush and roller selection guidance; confirm the selected coating’s application instructions.
Original document revision
Not stated in the reviewed document
Review method
Source content reviewed with assistance from Codex

How do I choose brushes and roller covers?

Start with the coating and surface, then check the manufacturer's recommended tools. Brush and roller materials should suit the paint; roller nap also depends on the texture. A smoother wall and a rougher wall may need different covers. Bring the product information and a surface description or photo when choosing tools, instead of selecting a roller only by price or package size.

Why we recommend this
Manufacturer guidance

Sherwin-Williams · Selecting Brushes & Rollers

What this explains: Brush and roller materials depend on the coating. Roller nap depth is selected with the surface texture in mind; smoother and rougher surfaces have different guidance.

Keep in mind: Not a product-specific application specification, safety assessment or proof of LMJ workmanship. No brush-performance marketing figures are adopted here.

Read the original source ↗ (English · opens in a new tab)

Source content reviewed: November 7, 2026

Document and review details
Relevant section
Bristle Type; Roller Cover Material; Pile Depth.
Applies to
U.S. general brush and roller selection guidance; confirm the selected coating’s application instructions.
Original document revision
Not stated in the reviewed document
Review method
Source content reviewed with assistance from Codex

Can the home remain occupied?

LMJ planning suggestion

Tell LMJ which rooms need to remain accessible, who will be home and where furniture can go. Discuss the work sequence, ventilation, product precautions and access for children and pets before agreeing a start date. Keep your preferred schedule separate from the product's drying and use instructions. The plan should explain how occupied areas will be handled and when each space can be used again.

Why we recommend this
Government guidance

U.S. Environmental Protection Agency · Volatile Organic Compounds’ Impact on Indoor Air Quality

What this explains: Follow product precautions and provide ventilation when using products that release VOCs. Keep household products away from children and pets.

Keep in mind: A low-VOC label is not a room-safety guarantee or a fixed re-entry time. Workplace protection and project-specific ventilation require separate assessment.

Read the original source ↗ (English · opens in a new tab)

Source content reviewed: November 7, 2026

Document and review details
Relevant section
Steps to Reduce Exposure.
Applies to
U.S. household indoor-air guidance; consult the selected coating label and safety document.
Original document revision
June 23, 2026
Review method
Source content reviewed with assistance from Codex
Manufacturer guidance

Benjamin Moore · Regal Select Premium Interior Paint & Primer — Matte N548: Technical Data Sheet

What this explains: For Regal Select Matte N548, the U.S. technical sheet lists one hour to touch and one to two hours to recoat at 77°F (25°C) and 50% relative humidity. Cool conditions or high humidity extend dry, recoat and service times. Surface application temperature is 50–90°F; washing is allowed after two weeks. Coverage is 400–450 square feet per U.S. gallon, depending on surface texture and porosity.

Keep in mind: Example for N548 only. These figures are not a promise for every paint, sheen, climate, substrate or project. Touch-dry, recoat, washing and full cure are different milestones; the sheet does not supply a universal full-cure time.

Read the original source ↗ (English · opens in a new tab)

Source content reviewed: November 7, 2026

Document and review details
Relevant section
PDF page 1, Technical Data, Dry Time and Surface Temperature During Application; page 2, Surface Preparation and safety directions.
Applies to
U.S. product sheet. Regal Select Premium Interior Paint & Primer, Matte N548.
Product / sheen
Regal Select N548 · Matte
Original document revision
Not stated in the reviewed document · Printed identifier: N548 US 032525
Review method
Source content reviewed with assistance from Codex

Regal Select PREMIUM INTERIOR PAINT & PRIMER — MATTE N548 ↗ (Spanish · opens in a new tab)

Official Spanish sheet identifier: N548 SP 030823. The English sheet is N548 US 032525. These are different editions; the reviewed dry/recoat figures agree, but exact technical parity is not claimed.

Sources and review informationSee the references and when they were reviewed.

LMJ explains this information using the sources linked below. Product instructions and site conditions determine the appropriate approach. Referencing an organization does not imply its endorsement of LMJ.

Design and planning ideas are LMJ suggestions. These sources explain the technical guidance; they do not document LMJ projects or certifications.

Painting Contractors Association · PCA P14 — Levels of Surface Preparation for Repainting and Maintenance Projects Receiving Architectural Coatings
Industry reference

Painting Contractors Association · PCA P14 — Levels of Surface Preparation for Repainting and Maintenance Projects Receiving Architectural Coatings

What this explains: PCA P14 distinguishes four preparation levels and explains that existing surface condition and the selected preparation affect appearance, adhesion, durability and cost. Project specifications describing the type and extent of preparation take precedence.

Keep in mind: Applies to repainting/maintenance architectural coatings on previously finished surfaces. A written scope should identify the agreed preparation; citing P14 alone does not specify a level or promise restoration of every defect. No LMJ adoption or compliance is verified.

Read the original source ↗ (English · opens in a new tab)

Source content reviewed: November 7, 2026

Document and review details
Relevant section
P14 sections 1, 2.1–2.5, 5.2 and 5.4.
Applies to
U.S. architectural painting industry guidance; project agreement controls as applicable.. Repainting/maintenance preparation, rather than a universal new-construction specification.
Original document revision
Not stated in the reviewed document · Printed identifier: 20230918 in the official linked filename
Review method
Source content reviewed with assistance from Codex

Niveles de Preparación de Superficies para Proyectos de Repintado y Mantenimiento que Reciben Revestimientos Arquitectónicos ↗ (Spanish · opens in a new tab)

Official Spanish individual P14 linked from PCA Spanish page; scope and section 5.2 read. Layout and section organization differ; exact edition parity is not established.

Painting Contractors Association · PCA P3 — Impact of Paint Color
Industry reference

Painting Contractors Association · PCA P3 — Impact of Paint Color

What this explains: PCA P3 says the number and location of paint colors and color ranges belong in bid and contract documents. It also calls for precise placement when different materials or sheens share a surface. These choices affect estimating and project cost.

Keep in mind: Industry guidance does not demonstrate LMJ membership, certification, adoption or compliance. It supports documenting the actual agreed scope, not promising that every estimate already follows PCA. It does not endorse an aesthetic palette.

Read the original source ↗ (English · opens in a new tab)

Source content reviewed: November 7, 2026

Document and review details
Relevant section
P3 sections 2.1–2.2, 5.1–5.2 and 5.6.2.
Applies to
U.S. architectural painting industry guidance; use as the identified voluntary standard in a project agreement as applicable.. Paint color count, range, placement and associated bid/contract scope.
Original document revision
Not stated in the reviewed document · Printed identifier: 20230918 in the official linked filename
Review method
Source content reviewed with assistance from Codex

PCA P3 — Designación del color de pintura ↗ (Spanish · opens in a new tab)

Official Spanish individual standard linked from the PCA Spanish page; sections 1, 2 and color-placement provisions read. Title, organization and wording differ from the English file, so do not claim exact edition parity.

Sherwin-Williams · Selecting Brushes & Rollers
Manufacturer guidance

Sherwin-Williams · Selecting Brushes & Rollers

What this explains: Brush and roller materials depend on the coating. Roller nap depth is selected with the surface texture in mind; smoother and rougher surfaces have different guidance.

Keep in mind: Not a product-specific application specification, safety assessment or proof of LMJ workmanship. No brush-performance marketing figures are adopted here.

Read the original source ↗ (English · opens in a new tab)

Source content reviewed: November 7, 2026

Document and review details
Relevant section
Bristle Type; Roller Cover Material; Pile Depth.
Applies to
U.S. general brush and roller selection guidance; confirm the selected coating’s application instructions.
Original document revision
Not stated in the reviewed document
Review method
Source content reviewed with assistance from Codex
U.S. Environmental Protection Agency · Volatile Organic Compounds’ Impact on Indoor Air Quality
Government guidance

U.S. Environmental Protection Agency · Volatile Organic Compounds’ Impact on Indoor Air Quality

What this explains: Follow product precautions and provide ventilation when using products that release VOCs. Keep household products away from children and pets.

Keep in mind: A low-VOC label is not a room-safety guarantee or a fixed re-entry time. Workplace protection and project-specific ventilation require separate assessment.

Read the original source ↗ (English · opens in a new tab)

Source content reviewed: November 7, 2026

Document and review details
Relevant section
Steps to Reduce Exposure.
Applies to
U.S. household indoor-air guidance; consult the selected coating label and safety document.
Original document revision
June 23, 2026
Review method
Source content reviewed with assistance from Codex
Benjamin Moore · Regal Select Premium Interior Paint & Primer — Matte N548: Technical Data Sheet
Manufacturer guidance

Benjamin Moore · Regal Select Premium Interior Paint & Primer — Matte N548: Technical Data Sheet

What this explains: For Regal Select Matte N548, the U.S. technical sheet lists one hour to touch and one to two hours to recoat at 77°F (25°C) and 50% relative humidity. Cool conditions or high humidity extend dry, recoat and service times. Surface application temperature is 50–90°F; washing is allowed after two weeks. Coverage is 400–450 square feet per U.S. gallon, depending on surface texture and porosity.

Keep in mind: Example for N548 only. These figures are not a promise for every paint, sheen, climate, substrate or project. Touch-dry, recoat, washing and full cure are different milestones; the sheet does not supply a universal full-cure time.

Read the original source ↗ (English · opens in a new tab)

Source content reviewed: November 7, 2026

Document and review details
Relevant section
PDF page 1, Technical Data, Dry Time and Surface Temperature During Application; page 2, Surface Preparation and safety directions.
Applies to
U.S. product sheet. Regal Select Premium Interior Paint & Primer, Matte N548.
Product / sheen
Regal Select N548 · Matte
Original document revision
Not stated in the reviewed document · Printed identifier: N548 US 032525
Review method
Source content reviewed with assistance from Codex

Regal Select PREMIUM INTERIOR PAINT & PRIMER — MATTE N548 ↗ (Spanish · opens in a new tab)

Official Spanish sheet identifier: N548 SP 030823. The English sheet is N548 US 032525. These are different editions; the reviewed dry/recoat figures agree, but exact technical parity is not claimed.

Dates record a content review, not just a working link. An internal record retains the reviewer or review tool, conditions and follow-up items.

Bring your questions to LMJ.

Your property may need a different approach. Tell us your city, the surfaces you want painted and what you would like help deciding.

Request a quote